From:                              route@monster.com

Sent:                               Sunday, May 01, 2016 7:45 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: Dispatch Clerk

 

This resume has been forwarded to you at the request of Monster User xapeix03

Sengphet Souimaniphanh 

Last updated:  04/25/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Keller, TX  76248
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Construction/Project Manager

Resume Value: 5dmid8i348k9vzzu   

  

 

SENGPHET SOUIMANIPHANH

13158 Seha-Payak Road 

Fort Worth, TX 76248 

Mobile: (972) 834-5070

Sengphet.souimaniphanh@gmail.com

 

Objective:

 

To obtain a position in an industry where my creative talents, experiences, background, engineer design and project management skills will be of value and utilize.  Looking for a Department that wants a determined, hard worker, quick learner, willing to learn and completes the job proficiently.

 

Professional Experiences:

 

Construction SupervisionConstruction InspectionConstruction Management

Architectural DesignProject ManagementZoning Ordinance Review

Structural Steel Design    Site Planning/AnalysisGraphic Layout/Design

Drafting Design    Steel Detailing      Illustration/Rendering

Site Acquisition                 Drawing ReviewAnt. Mounting Design

Installation Costing             Scope Writing                        Negotiating Support

LH Microwave                      MiniLink Microwave            DAS/In-Building

Cost Estimator

 

Education:

2002 – ANDREW Certified

2000 – OSHA Certified.

1997 – NORTEL Telecom CDMA Technology Certified.

1997 – LYNCOLE Advanced Technology in Grounding Certified.

 

Tarrant County Junior College/ Tarleton State University

1987-1991.

Studied engineering, architectural design and general business management.  Became familiar with     various types of computer software including MS Word, WordPerfect, Excel, Lotus and AutoCAD.

 

V.T.I. - Technical School

1986-1987.

Completed course work in design, planning, Illustration and presentation techniques in order to fulfill the requirements of the professional program.  Studied and learned AutoCAD.

 

 

Professional Experiences:

 

 

               Excell Services Company/KMM Corp

Project  Manager

Grapevine – 9/15 – 3/16

 

·               Cost estimator, provided cost to sale’s team.

·               Managing projects including construction installation and expansion of PCS cell sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Provide and support Operations with scopes clarification and costs.

·               Create Scope of Work facing vendors

·               Support CM and Contractor with scope clarification.

·               Soliciting competitive bids for capital project work and selecting appropriate Contractors and equipment vendors.

·               Working with EF&I team to determine demarcation between civil and EF&I team

·               Validating Contractor for their capability and capacity.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Review CD to ensure it match with the scopes.

·               Create turnover package to submit to client.

·               Supporting KMM, Managed the Grapevine and Piscataway Ericsson Training Centers and the Fiber expansion projects.

 

 

 

Phet Water Company

Owner/ Manager

Fort Worth – 3/14 – Prestent

 

·               Managing activities including construction installation and expansion of new customers according to time and cost guidelines while remaining within the constraints of external entities such as local zoning and permitting authorities.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Provide and support Engagement Practice and Operation with scopes clarification and costs.

·               Create Scope of Work facing vendors

·               Negotiates costs and scope clarification.

·               Soliciting competitive bids for project work and selecting appropriate Contractors and equipment vendors.

·               Working with Civil team to determine the demarcation of the meter and water line routing

·               Validating Contractor for their capability and capacity.

·               Reporting to State and local management on project status through project team meetings, written communications, and database entries.

·               Perform monthly water testing and provide the test to the State

·               Read meter and perform billing.

·               Repaired leaks.

 

 

 

               Ericsson

Site Development Manager

Plano – 3/06 – 3/14

 

·               Cost estimator, provided cost to sale’s team.

·               Managing projects including construction installation and expansion of PCS cell sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Provide and support Engagement Practice and Operation with scopes clarification and costs.

·               Create Scope of Work facing vendors

·               Support Sourcing during negotiation with scope clarification.

·               Soliciting competitive bids for capital project work and selecting appropriate Contractors and equipment vendors.

·               Working with EF&I team to determine the demarcation between civil and EF&I team

·               Validating Contractor for their capability and capacity.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Supported Macro, Microwave LH and Minilink and DAS project

·               Supporting CU, EP, Operation, ASP Management and Sourcing.       

·               Design and sketch cell site to accommodate GSM,UMTS, LTE and AWS Technologies.

·               Create turnover package to submit to client.

 

Achievements:

·               Help won the AT&T Turf project and many others.

·               Developed and implemented procedure for storage of CAD files for surveys and construction drawings; this information was readily available for dissemination to architects, engineers, contractors and municipalities for use in project completion.

 

 

 

Bechtel/Cingular – ERGU/UMTS Project

Construction Field Coordinator

Ontario, Irvine, CA – 7/05 – 3/06

 

·               Managing projects including construction installation and expansion of PCS cell sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Establishing timeline and budget guidelines for projects with appropriate internal groups and submitting these guidelines for management approval.

·               Soliciting competitive bids for capital project work and selecting appropriate contractors and equipment vendors.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.          

·               Design and sketch cell site to accommodate UMTS Technology.

·               Create turnover package to submit to client.

 

Darwin Partners-Trueposition/T-Mobile – E911 Project

Atlanta, GA, Detroit, MI, Columbus & Cleveland, OH Markets - 9/04 – 7/05

Project Manager

 

·Managing Trueposition E911projects including construction installation according to time and cost.

·Establishing timeline, the scope of work and the material order for the projects.

·Generate schedule for LMU installations for up to 5 crews.

·Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·Inspecting LMU installations.

·                      Reporting to management on project status through project team meetings, written 

              communications, and database entries.

·                      Update Trackers and inspect survey from contractor.

·Completing and reviewed the turnover packets from the General Contractor.

 

 

 

 

 

 

 

 

 

Bechtel/ AT&T Wireless – E911 Project

NC, CT, NJ, Philly, AL, Waco TX, Wichita Falls TX, KS, East TX/LA  & Dallas Markets - 10/02 – 6/04

Construction Field Coordinator

 

 

·               Managing E911projects including construction installation and expansion of PCS cell sites according to time and cost.

·               Establishing timeline, the scope of work and the material order for the projects.

·               Walk down survey on existing cell sites for E911 system for the WLS installations.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing drawing determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Completing and reviewed the turnover packets from the General Contractor.

 

 

 

 

CrownCastle International/Cricket Wireless

Construction Manager

Pittsburgh, Pennsylvania - 12/00 – 10/02

 

·               Managing capital projects including construction installation and expansion of PCS cell sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Establishing timeline, the scope of work and the material order for the projects.

·               Establishing timeline, the scope of work and the material order for the projects.

·               Soliciting competitive bids for capital project work and selecting appropriate contractors and equipment vendors.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Design and detailing the structure steel for antenna mounts and misc. mounts for Pittsburgh market.

 

Achievements:

·               Participated in the management of 250 cell sites from site acquisition to equipment installation and final site approval; Cricket Wireless.

·               Developed and implemented procedure for storage of CAD files for surveys and construction drawings; this information was readily available for dissemination to architects, engineers, contractors and municipalities for use in project completion.

 

 

 

Bechtel/ATT

Construction Field Coordinator

Dallas, Texas - 12/99 - 12/00

 

·               Managing capital projects including construction installation and expansion of PCS cell and switch sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Establishing timeline and budget guidelines for projects with appropriate internal groups and submitting these guidelines for management approval.

·               Soliciting competitive bids for capital project work and selecting appropriate contractors and equipment vendors.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.          

·               Design and detailing the structure steel for antenna mounts and misc. mounts for Dallas and Louisiana markets offices.

 

Achievements:

·               Participated in the management of 50 cell sites from site acquisition to equipment installation and final site approval; AT&T Wireless,

·               Developed and implemented procedure for storage of CAD files for surveys and construction drawings; this information was readily available for dissemination to architects, engineers, contractors and municipalities for use in project completion.

 

 

 

Pathnet

Wireless Microwave & Fiber Optic Implementation Manager

Richardson, Texas – 3/98 – 12/99

 

·               Managing capital projects including construction installation and expansion of Microwave sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Establishing timeline and budget guidelines for projects with appropriate internal groups and submitting these guidelines for management approval.

·               Soliciting competitive bids for capital project work and selecting appropriate contractors and equipment vendors.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Design and detailing the structure steel for antenna mounts and misc. mounts for any system in need of antenna mount materials.

·               Create a Scope of Work package to send out to contractors for bid.

·               Set up meeting between Pathnet, Contractors and Incumbents.

·               Managing the Interconnect Microwave/Fiber optic site to local landline. 

 

Achievements:

·               Participated in the management of 55 Microwave hops from site acquisition to equipment installation and final site approval; Pathnet central region has successfully launched a 100% digital wireless services network within microwave systems.

·               Developed and implemented procedure for storage of CAD files for surveys and construction drawings; this information was readily available for dissemination to architects, engineers, contractors and municipalities for use in project completion.

·               Developed prototypical layout scenarios for tower compounds; property specialists were able to reference these prototypical layouts when negotiating lease area from property owners.

·               Created hand sketches as well as CAD conceptual drawings which were forwarded to A&E firms for completion of construction drawings.  Construction drawings were then reviewed upon receipt for accuracy and forwarded to the general contractor for start of construction.

·               Created a well relationship with the Incumbents and the General Contractors.

·               Developed the standard for the Scope of Work package.

 

 

 

Sprint PCS

Wireless Implementation Engineer

Dallas, Texas - 8/96 - 3/98

 

·               Managing capital projects including construction installation and expansion of PCS cell and switch sites according to time and cost guidelines while remaining within the constraints of external entities such as the FCC, FAA, and local zoning and permitting authorities.

·               Establishing timeline and budget guidelines for projects with appropriate internal groups and submitting these guidelines for management approval.

·               Soliciting competitive bids for capital project work and selecting appropriate contractors and equipment vendors.

·               Accommodating unplanned projects that become necessary by proposing guidelines for approval and then implementing the procedure.

·               Inspecting construction sites during several phases of construction for procedural accuracy and reviewing test data to determine if company specifications were properly met.

·               Reporting to management on project status through project team meetings, written communications, and database entries.

·               Design and detail the steel structure for antenna mounts and misc. mounts for Dallas and Austin MTA offices.

 

Achievements:

·               Participated in the management of 42 cell sites from site acquisition to equipment installation and final site approval; Sprint PCS, Dallas MTA has successfully launched a 100% digital wireless services network consisting of over 250 cell sites and 3 switch sites.

·               Developed and implemented procedure for storage of CAD files for surveys and construction drawings; this information was readily available for dissemination to architects, engineers, contractors and municipalities for use in project completion.

 

 

 

FTW Inc. (Fort Worth Tower)

Fort Worth, Texas - 6/91 - 8/96

Engineer/Draftsman

 

 

·               Completing designs and drawings throughout all stages of project and meeting delivery schedule.

·               Checking Designs, Details and Installation manuals.

·               Field assistance on tower, antenna mount and misc. mount erection.

 

Achievements:

·               Began producing accurate design and detail drawings using ClarisCad and AutoCAD.

·               Developed standard drawing for erection manual to cut down some drafting time.

·               Established good friendship with clients and provide better support service to clients.

 

 

 

Midas Rex Pneumatic Tool Inc. (Engineering & Mfg. Medical Dissecting Tool)

Fort Worth, Texas - 5/87 - 6/91

Design Draftsman

 

 

·               Providing ideas of different design to Machinist and President of company for approval.

·               Providing a dissecting tool design drawing to Machinist and President of company for approval.              

 

Achievements:

·               Became more valuable to the company and received employee of the year award.

·               Got to meet with representatives from different hospitals throughout the USA.

 



Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Fort Worth

Relocate:

Yes

 

Languages:

Languages

Proficiency Level

English

Fluent